April-Oct. 2021 RV-C Layer Document & Approved Submission

The archive includes the April 2021 RV-C Layer Document and Approved Submissions (Attached) to Oct. 31, 2021. The Approved Submissions were added to the most recent version of the RV-C Layer Document.

Please review Approved Official Business Posts Below:
Approved Submissions Archive

For the Most Current Revision of the RV-C Layer Document please refer to the RV-C Specification:
RV-C Specification

AttachmentSize
RV-C Layer Document 4-8-21.pdf9.85 MB
Section_6.19.25_Inverter_041621.docx24.74 KB
Section_6.13.12_SPN_Table_042221.docx19.31 KB
6.38.4 & .5 Awning Status 2 042421.doc40.5 KB
Vehicle Seat Control rev2 4-26-21.doc85 KB
Table_6.49.7b_051221.docx15.82 KB
Table_6.13.5b_correction_051221.docx17.36 KB
Table 6.2.5b Change_052721.docx15.41 KB
Section 6.17_061421.docx37.58 KB
Section_6.16_061421.docx29.33 KB
6.49.13 Battery Status 13 Update 061521.docx18.52 KB
6.50 DC Driver Amendment 061821.docx28.78 KB
Table 6.49.15.b Update 070821.docx16.41 KB
Table 6.43.1b Update 070821.docx15.62 KB
Section 6.41 remove GPS 070821.docx17.79 KB
Amend Table 6.34.6.b 070821.docx15.86 KB
Table 3.3.2a Update 070821.docx14.63 KB
Section 6.18.20_.21 Removal 070821.docx19.9 KB
Section_6.5.21 _081121.docx19.21 KB
Section 6.5.7_081121.docx23.04 KB
6.38.4 .5_Awning_Status Command_081621.docx30.53 KB
Tables 6.13.2b & .3b Leveling Controls 091321.docx24.16 KB
6.20.10 & .27 Charger Status 3 & Alarms Addition 090221.docx25 KB
6.19.23 Inverter Temperature Status Addition 090221.docx27.08 KB
Table 6.35.3b Update Generator Demand Command 092221.docx26.47 KB
6.27_DC_Motor_Control_Submission_092321.docx31.14 KB