Power Group : AC Point

From the Power Group,

Edits and Profiles for AC Points.

The AC_POINT DGNs apply to a number of different products, including transfer switches, gensets, inverters, and others. The test profiles apply to these products as well. In this document, the tests have been given the prefix 02, rather than a specific DSA. This is simply a placeholder, and in actual use the tests shall be numbered per the DSA of the device the test is being applied to. The Adminstrator shall indicate this in the final document.

AttachmentSize
6_1 AC_Point Edit 022020.docx54.14 KB

Should there be any alarms? I

Should there be any alarms? I have used alarms in the solar section to indicate change of state or faults as follows.

1 History cleared
2 High solar voltage limit
100 Solar charge controller enabled
101 Solar charge controller disabled
102 Solar charge controller over temperature
103 Solar controller configuration changed
104 Solar controller configuration 2 changed
105 Solar controller configuration 3 changed
106 Solar controller configuration 4 changed
107 Solar controller configuration 5 changed
108 Solar controller equalization configuration changed
110 Transition to bulk stage
111 Transition to absorption stage
112 Transition to Overcharge State
113 Transition to Equalize State
114 Transition to float stage
115 Transition to CC/CV Stage
116 Charging complete
119 Low battery warning
120 Low battery voltage limit
121 High battery voltage limit
122 Battery over temperature
123 Battery under temperature
124 Battery Disconnected